NEW QUESTION # 39
Which two are needed to update the ESM on a PowerEdge server? (Choose two.)
- A. the SMFLASH utility
- B. the ESMFLASH utility
- C. Windows 9x bootable floppy
- D. Windows NT fault-tolerant boot floppy
Answer: A,C
NEW QUESTION # 40
What are three types of NIC teaming? (Choose three.)
- A. Load Balancing
- B. Fault Tolerance
- C. Cluster Teaming
- D. Generic Trunking
Answer: A,B,D
NEW QUESTION # 41
What should you do before removing or reseating the RAID memory?
- A. remove the hard drives
- B. disconnect the RAID key
- C. disconnect the RAID battery
- D. disconnect the RAID cable
Answer: C
NEW QUESTION # 42
Using Array Manager, what must you do when changing the drive letter of one of your volumes? (Choose two.)
- A. You must find if there are program(s) installed on that volume, because changing the drive letter might render the program(s) in-executable.
- B. First you must ensure the drive letter has been removed by selecting the Remove option. The drive letter cannot be changed.
- C. You must ensure you are using Microsoft Windows 2000 operating system because drive letters cannot be changed using Microsoft Windows NT 4.0.
- D. You must ensure the volume does not contain the boot volume.
Answer: A,D
NEW QUESTION # 43
Which two components can be installed in the 0U space found in Dell racks? (Choose two)
- A. Dell Dual-Power Grid Switch
- B. Dell flat panel monitor
- C. Dell PDU
- D. Dell UPS
Answer: A,C
NEW QUESTION # 44
Which two Dell servers are rack dense optimized? (Choose two.)
- A. PowerEdge 2600
- B. PowerEdge 1750
- C. PowerEdge 1600SC
- D. PowerEdge 1655MC
Answer: B,D
NEW QUESTION # 45
You select the RAID Configuration Utility from the Utility Partition menu. This takes you to the _____.
- A. CERC BIOS
- B. system setup
- C. PERC BIOS
- D. Array Manager
Answer: C
Explanation:
Explanation/Reference:
Explanation:
NEW QUESTION # 46
How many DIMMs are required for the minimum memory configuration on a server with four-way interleaving memory addressing?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION # 47
Which two must be included in the setup of SNMP to properly configure it? (Choose two.)
- A. trap destination
- B. Get All operations
- C. NetBEUI
- D. community name
Answer: A,D
Explanation:
Explanation/Reference:
Explanation:
NEW QUESTION # 48
Which two operations can be performed with the DSA CD? (Choose two.)
- A. change the Dell Service Tag via the Service Tag Utility
- B. run system diagnostics on your server
- C. create Windows 2000 driver/utilities diskette(s)
- D. create NetWare 5.1/6.0 driver/utilities diskette(s)
Answer: C,D
Explanation:
Explanation/Reference:
Explanation:
NEW QUESTION # 49
Which three statements are true for the OpenManage IT Assistant inventory page? (Choose three.)
- A. The inventory page reports the status of a system.
- B. The inventory page is sortable by any column.
- C. The number of columns that can be selected at any one time on the inventory page is limited to ten.
- D. The inventory page supports printing to a printer.
- E. Inventory items in the inventory page for a discovered system are updated upon each discovery round.
Answer: B,D,E
NEW QUESTION # 50
What should you do before removing or reseating the RAID memory?
- A. remove the hard drives
- B. disconnect the RAID key
- C. disconnect the RAID battery
- D. disconnect the RAID cable
Answer: C
Explanation:
Explanation/Reference:
Explanation:
NEW QUESTION # 51
You just added a new Dell PowerEdge server to the network. In order to use Dell OpenManage IT Assistant to manage it, which three steps do you need to take? (Choose three.)
- A. install Dell OpenManage Managed System applications on the new server
- B. install Dell OpenManage Remote Access Controller on the new server
- C. ensure that the new server's IP address is in the discovery specified for OpenManage IT
Assistant - D. verify the SNMP settings of the new server
- E. install Dell OpenManage Management Station application on the new server
Answer: A,C,D
NEW QUESTION # 52
You are setting up a RAID using Dell Array Manager. What effect does selecting Express Mode have?
- A. It allows Array Manager to automatically select the RAID level and array size.
- B. It performs a quick format on all hard drives.
- C. It automatically creates an array and installs the operating system with no user input.
- D. It allows settings to be entered before array creation and then performs an unattended setup.
Answer: A
NEW QUESTION # 53
Which three statements are true about installing the Intel drivers and utilities that allow teaming in Windows
2000? (Choose three.)
- A. If you install the adapters after you have installed the OS, you can get the ProSet Utility from the Intel ProSet Utility CD.
- B. Loading Windows 2000 using the DSA CD-ROM loads the drivers and ProSet Utility.
- C. You must install the ProSet Utility.
- D. If you install the adapters after you have installed the OS, you can get the drivers from the Intel Network Drivers CD.
- E. You must install the Intel driver using floppy diskettes.
Answer: B,C,D
Explanation:
Explanation/Reference:
Explanation:
NEW QUESTION # 54
You can obtain the Dell Utility Partition in which two ways? (Choose two.)
- A. It can be installed from the DSA CD before an OS is installed.
- B. It is included on the hard drive from the factory.
- C. It can be installed from the OpenManage Documentation CD.
- D. Download the install file from www.dell.com.
Answer: A,B
Explanation:
Explanation/Reference:
Explanation:
NEW QUESTION # 55
What are three ways you can flash the BIOS on a PowerEdge server? (Choose three.)
- A. using Device Manager
- B. using ITA
- C. using OMSA
- D. using DSA
- E. using a floppy diskette
Answer: B,C,E
NEW QUESTION # 56
You want half of the six hard drives in your server to be on a separate SCSI bus. How would you achieve this?
- A. add an additional processor to the server
- B. turn on the Split Backplane option in the PERC BIOS
- C. split the backplane to a 2x4 backplane
- D. split the backplane to a 1x3 backplane
Answer: C
NEW QUESTION # 57
What is the purpose of the battery on a PERC?
- A. provides power to the PERC controller
- B. preserves the hard drive configuration
- C. maintains the PERC BIOS settings
- D. saves the cache contents during a power loss
Answer: D
NEW QUESTION # 58
Which two components can be installed in the 0U space found in Dell racks? (Choose two)
- A. Dell Dual-Power Grid Switch
- B. Dell flat panel monitor
- C. Dell PDU
- D. Dell UPS
Answer: A,C
Explanation:
Explanation/Reference:
Explanation:
NEW QUESTION # 59
What should you do to clear NVRAM and force the system to reset its configuration data?
- A. in the System Setup utility, activate the Num Lock, Caps Lock, and Scroll Lock lights on the keyboard, then press Alt-E
- B. NVRAM cannot be cleared once it has been set by an administrator.
- C. press F10 when prompted at startup
- D. boot to the Dell Server Assistant CD first
Answer: A
NEW QUESTION # 60
......
DC0-200 Dumps PDF - DC0-200 Real Exam Questions Answers: https://www.prep4sures.top/DC0-200-exam-dumps-torrent.html