NEW QUESTION # 28
To which object do you assign a costing sheet?
- A. Valuation variant
- B. Cost component structure
- C. Costing variant
- D. Transfer control
Answer: A
NEW QUESTION # 29
How do you maintain number range intervals for documents in Controlling?
Note: There are 2 correct answers to this question.
- A. By document type
- B. By controlling area
- C. By client
- D. By business transactions
Answer: B,D
Explanation:
Detailed Explanation:Number range intervals in SAP S/4HANA are maintained by business transactions and controlling area, allowing document numbering to be systematically organized and controlled within specific areas and transaction types.
NEW QUESTION # 30
Which of the following statements are applicable to automatic account assignment in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. It takes precedence over validation and substitution.
- B. It can be overwritten in the application.
- C. It can be defined for postings on general ledger accounts of secondary costs type.
- D. It can be defined for postings on general ledger accounts of primary costs type.
Answer: A,D
NEW QUESTION # 31
What can you do with statistical internal orders?
- A. Settle costs to a cost center.
- B. Apply overhead rates to the internal order.
- C. Transfer posting to another internal order.
- D. Simultaneously post to a cost center.
Answer: D
NEW QUESTION # 32
Which processes split costs into their primary cost components?
Note: There are 2 correct answers to this question.
- A. Business process price calculation
- B. Top down distribution
- C. Execution of the assessment cycles
- D. Cost center/activity type price calculation
Answer: A,D
Explanation:
Detailed Explanation: Business process price calculation (option B) and cost center/activity type price calculation (option D) split costs into primary cost components. These processes allow more detailed cost tracking by itemizing primary costs, aiding transparency in SAP S/4HANA Management Accounting.
NEW QUESTION # 33
Which setting in the cost center master data do you use to assign the same attributes to similar cost centers?
- A. Cost center department
- B. Standard hierarchy node
- C. Cost center category
- D. Functional area
Answer: C
Explanation:
Detailed Explanation:The cost center category in SAP S/4HANA allows grouping of similar cost centers, enabling the assignment of consistent attributes and settings, thus streamlining configuration and reporting.
NEW QUESTION # 34
Which parameters are controlled by the costing type in a costing variant?
Note: There are 2 correct answers to this question.
- A. Price for materials
- B. Save with date key
- C. Costing sheet
- D. Price updates
Answer: B,D
Explanation:
Detailed Explanation:In SAP S/4HANA, the costing type in a costing variant specifies parameters like date key for saving costs and price updates, allowing businesses to manage cost calculations over different periods and adjust for price changes.
NEW QUESTION # 35
How do you define the relationship between an operating concern and a controlling area?
- A. One-to-many (1:N)
- B. One-to-one (1:1)
- C. Many-to-many (N:M)
- D. Many-to-one (N:1)
Answer: A
NEW QUESTION # 36
Which receiver must be allowed in the settlement profile of product cost collector?
- A. G/L Account
- B. Cost center
- C. Material
- D. Order
Answer: C
NEW QUESTION # 37
You are working in the machinery industry and you consider implementing cost center budget management.
Which functions are available for cost center budget management? Note: There are 2 correct answers to this question.
- A. Budget transfer from source cost center to multiple target cost centers
- B. Unused budget carry-forward to next fiscal year
- C. Budget values import with CSV file
- D. Availability control against monthly budget amount
Answer: A,C
NEW QUESTION # 38
You create alternative CO versions for your controlling area, in addition to version 0. What would you use additional CO versions for? Note: There are 2 correct answers to this question.
- A. To store different plan data
- B. To store data of parallel valuation
- C. To store data of alternative plan costing runs
- D. To store different budget data
Answer: A,B
NEW QUESTION # 39
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.
- A. Profit center
- B. Internal order
- C. Sales order item
- D. WBS element
- E. General ledger account
Answer: B,C,D
NEW QUESTION # 40
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control?
Note: There are 2 correct answers to this question.
- A. The availability of funds in object currency
- B. The availability of funds on a period level
- C. The availability of funds using overall plan value
- D. The availability of funds according to tolerance limits
Answer: C,D
Explanation:
Detailed Explanation: Budget availability control in SAP S/4HANA allows checking funds based on overall plan value (option C) and tolerance limits (option D). These checks ensure effective budget management across projects and internal orders.
NEW QUESTION # 41
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual cost=1000
What data does the system calculate during results analysis?
- A. "Revenue = 1500; Cost of sales = 1000; Revenue surplus =300"
- B. "Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200"
- C. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
- D. "Revenue = 1200; Cost of sales = 1000; Revenue surplus =200"
Answer: C
NEW QUESTION # 42
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled?
Note: There are 2 correct answers to this question.
- A. Costing-based Profitability Analysis must be active.
- B. The type of the addressed ledger must be an extension ledger.
- C. The type of the general ledger account must be primary cost/revenue or secondary cost.
- D. Account-based Profitability Analysis must be active.
Answer: C,D
Explanation:
Detailed Explanation: For deriving profitability segments in the Universal Journal, account-based Profitability Analysis must be activated (option A), and the G/L account should be either primarycost/revenue or secondary cost type (option D). This configuration enables detailed profitability tracking in SAP S/4HANA.
NEW QUESTION # 43
Which of the following statements best describe Product Cost by Order?
Note: There are 2 correct answers to this question.
- A. It is recommended for products with a long production time.
- B. It is used when controlling by individual production lots or discrete quantities is needed.
- C. It is used when full cost traceability is needed.
- D. It is used when you perform repetitive manufacturing.
Answer: B,C
Explanation:
Detailed Explanation: Product Cost by Order is suitable for scenarios requiring full cost traceability (option B) and individual control of production lots (option C). This is especially useful in discrete manufacturing environments where specific lot costing is necessary.
NEW QUESTION # 44
Which type of Profitability Analysis updates the cost of goods sold at the time of delivery?
- A. Periodic-accounting based
- B. Costing-based only
- C. Account-based only
- D. Both account-based and costing-based
Answer: C
NEW QUESTION # 45
Your enterprise has five company codes assigned to three separate operating charts of accounts.
What is the optimal way of configuring the relationship between operating concerns and controlling area?
- A. One operating concern; three controlling areas
- B. One operating concern; five controlling areas
- C. Three operating concerns; three controlling areas
- D. One operating concern; one controlling area
Answer: A
Explanation:
Detailed Explanation:A single operating concern linked to multiple controlling areas is optimal for unified reporting across multiple charts of accounts, allowing each controlling area to map local requirements while sharing consolidated financial data.
NEW QUESTION # 46
For which of the following situations would you need to implement the transfer price solution in SAP S4/NANA?
- A. Parallel price calculation and invoicing are needed to facilitate intercompany reconciliation.
- B. Parallel accounting is needed in order to be compliant with different accounting principles.
- C. Parallel costing is needed in order to calculate separate costs of goods manufactured for different accounting principles.
- D. Parallel variation views of the same logistical flows are needed to differentiate between legal and profit center valuation.
Answer: D
NEW QUESTION # 47
You want to understand why costs are collected on the sales order item level.
What do you need to check in the configuration?
Note: There are 3 correct answers to this question.
- A. Account assignment category
- B. Valuation variant
- C. Requirements class
- D. Requirement type
- E. Costing type
Answer: A,C,D
Explanation:
Detailed Explanation:To ensure costs are collected at the sales order item level, you need to checksettings for the requirement type, account assignment category, and requirements class in SAP S/4HANA, which determine how and where costs are tracked and assigned.