NEW QUESTION 230
The files contained in the database are of two types which are:
- A. planning and procedural
- B. fixed and variable
- C. planning and control
- D. absolute and relative
Answer: C
NEW QUESTION 231
What is needed for items and is associated with master production scheduling?
- A. Demand management
- B. Supply management
- C. Chain management
- D. Product management
Answer: A
NEW QUESTION 232
MPS is meant to be:
- A. cyclic
- B. Flexible
- C. Rigid
- D. Depends on situation
Answer: B
NEW QUESTION 233
What consist of a series of operations required to make the item?
- A. All of the above
- B. routing
- C. builds
- D. procedures
Answer: B
NEW QUESTION 234
Which technique is based on the assumption that what happened in the past will happen in the future?
- A. Extrinsic Forecasting
- B. Quantitative Forecasting
- C. Average demand Forecasting
- D. Intrinsic Forecasting
Answer: D
NEW QUESTION 235
Projected available balance is calculated in which one of the following ways?
- A. PAB=prior period PAB or on-hand balance + MPS - customer orders
- B. Both of these depending on whether the period is before or after the period is before or after the demand time fence
- C. None of these
- D. PAB=prior period PAB + MPS - greater of customer orders or forecast
Answer: B
NEW QUESTION 236
Each of the following actions would reduce safety stock levels EXCEPT:
- A. reduce the customer service target
- B. adopt a make-to-order strategy
- C. increase lead times
- D. reduce forecast error
Answer: C
NEW QUESTION 237
Scheduled receipts shows:
- A. The quantities ordered
- B. When quantities ordered are expected to be available
- C. All of the Above
- D. When quantities ordered are expected to be completed
Answer: C
NEW QUESTION 238
There are following reasons of using sample inspections:
- A. All of these
- B. It is too expensive to test the entire batch and human errors is to be estimated as high as 20%
- C. Testing the product is destructive
- D. There is not enough to give 100% inspection to a batch of product
Answer: A
NEW QUESTION 239
Electric data interchange enables customers and suppliers to electromagnetically exchange transaction information.
- A. True
- B. False
Answer: B
NEW QUESTION 240
What is a problem for manufacturing, but it can be attained by overtime or under-time, shifting workers, and so forth?
- A. Capacity change
- B. Working center control
- C. Risk disbursement
- D. Input/Output rate
Answer: A
NEW QUESTION 241
is an internal net that is normally used within the boundaries of a company.
- A. Mini-net spot
- B. Intra-vagrant net
- C. Internet
- D. Intranet
Answer: A
NEW QUESTION 242
The systematic use of techniques that identify a required function, establish a value for that function, and finally provide that function at the lowest overall cost, is known as:
- A. Value analysis
- B. Quality analysis
- C. Functional analysis
- D. Specification analysis
Answer: A
NEW QUESTION 243
Capacity needs to be measured on following levels EXCEPT:
- A. None of these
- B. Work center
- C. Machine or individual
- D. Plant, which can be considered as a group of different work centers
Answer: A
NEW QUESTION 244
The length of time from when material enters a production facility until it exists, this is known as:
- A. assembly time
- B. workforce time
- C. creation time
- D. throughput time
Answer: D
NEW QUESTION 245
Find methods to maximize the utilization of the constraint toward productive throughput is called:
- A. None of the above
- B. Utilize constraint
- C. Exploit constraint
- D. Manage constraint
Answer: C
NEW QUESTION 246
Delivery lead time is the longest in case of:
- A. Make-to-order
- B. None of these
- C. Assemble-to-order
- D. Make to-stock
Answer: B
NEW QUESTION 247
The place where goods are stored for long periods and where the prime purpose is to protect goods until they are needed id called
- A. Go-down
- B. Distribution warehouse
- C. General warehouse
- D. Store house
Answer: C
NEW QUESTION 248
A load made up of a number of items or bulky material, arranged or constrained so the mass can be picked up or moved as a single unit too large for manual handling in called:
- A. Pallet load
- B. Unit load
- C. Package load
- D. Contemporary load
Answer: B
NEW QUESTION 249
To check the feasibility of the master Production Planning, provide warnings to any bottlenecks; ensure utilization of work centers and advice vendors of capacity requirements is the purpose of:
- A. Realistic capacity planning
- B. Rough-cut capacity planning
- C. Expected capacity planning
- D. Work-capacity planning
Answer: B
NEW QUESTION 250
How many standard hours are needed to run an order of 200 pieces if the setup time is 1.3 hours and the run time 0.3 hours per piece? How many actual hours are needed at the work center if the efficiency.130% and the utilization is 70%?
- A. 61.3 standard hours; 60.4 actual hours
- B. 62 standard hours; 60.4 actual hours
- C. 61.3 standard hours; 67.4 actual hours
- D. 51.3 standard hours; 67.4 actual hours
Answer: C
NEW QUESTION 251
Which factor influence effective use of warehouses?
- A. All of the above
- B. Cube utilization and accessibility
- C. Stock location
- D. Packaging
Answer: A
NEW QUESTION 252
To order exactly what is needed, no more, no less, this rule is called:
- A. Rigid-order rule
- B. Permanent lot
- C. lot-for-lot
- D. Fixed-order quantity
Answer: C
NEW QUESTION 253
Goods are not made continuously as in a flow system but are made at intervals in lots or batches in:
- A. Intermittent manufacturing
- B. Inflexible manufacturing
- C. Fixed manufacturing
- D. Discrete manufacturing
Answer: A
NEW QUESTION 254
......
APICS CPIM Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
Step by Step Guide to Prepare for CPIM Exam: https://www.prep4sures.top/CPIM-exam-dumps-torrent.html
APICS Certification CPIM Real Exam Questions and Answers FREE Updated: https://drive.google.com/open?id=1j-2t7gDTx_ytNJjisxwzwTKGk-cJ7Lp-