NEW QUESTION 43
A document is being created that will detail the customer's needs for a product and will include a functional model, a data model, and a glossary of terms. This document is called a:
- A. standard operating manual.
- B. project charter.
- C. business case.
- D. requirements specification.
Answer: D
Explanation:
Explanation/Reference: http://web.cse.ohio-state.edu/~bair.41/616/Project/Example_Document/Req_Doc_Example.html
NEW QUESTION 44
What should the business analyst do to ensure that all requirements meet a quality checklist before the development and testing phase?
- A. Obtain approval from engineering for partial testing of the requirements.
- B. Assign a verification method to each requirement.
- C. Validate the requirements deemed important by the stakeholders.
- D. Negotiate with the client to standardize the requirements.
Answer: C
NEW QUESTION 45
Which of the following can be used to determine if requirements align to the product's objectives?
- A. Five Whys
- B. Activity network diagrams
- C. Business use cases
- D. Context diagrams
Answer: C
NEW QUESTION 46
The document that defines the process for managing requirements revisions is the:
- A. project management plan.
- B. scope management plan.
- C. change management plan.
- D. communications management plan.
Answer: C
NEW QUESTION 47
What should the business analyst do during the first steps of a project?
- A. Align the sponsor expectations along the project goals.
- B. Identify the classes of users and their requirements.
- C. Identify stakeholders and their interests.
- D. Evaluate the sources for requirements and prioritize them.
Answer: C
Explanation:
Explanation/Reference: https://www.glowtouch.com/business-analysis-process-flow/
NEW QUESTION 48
When managing a product backlog, which statement best describes how to determine the value of backlog items?
- A. The stakeholders do not typically play a major role.
- B. The stakeholders provide recommendations with the product owner having the final say.
- C. The stakeholders follow the value-ranking criteria.
- D. The stakeholders provide input about backlog value when the item is first identified.
Answer: C
Explanation:
Explanation/Reference: https://www.scrum.org/resources/blog/10-tips-product-owners-business-value
NEW QUESTION 49
The business analyst is conducting a feasibility study to understand how well a potential solution fits into the organization. What kind of feasibility assessment is the business analyst undertaking?
- A. Cost-effectiveness
- B. Operational
- C. Time
- D. Technical
Answer: B
NEW QUESTION 50
A business analyst anticipates receiving requirements changes. What should the business analyst do to avoid scope creep?
- A. Define a requirements baseline and implement a change control process.
- B. Implement only the original requirements.
- C. Meet with the stakeholder and discuss timeline impact.
- D. Refer changes to the project manager.
Answer: A
NEW QUESTION 51
A company is in the final phases of implementing a project for a client. Which tool or technique could the business analyst use to iteratively validate the solution?
- A. Quality variance
- B. Expected vs. actual results
- C. Schedule variance
- D. Expected vs. actual costs
Answer: D
NEW QUESTION 52
During validation of a project solution, the business analyst discovers that a requirement has been altered.
Instead of placing the company logo in the upper-left corner of the window, it is displayed in the upper-right corner. When the business analyst asks the developer about the change, the developer says that one of the stakeholders asked directly for the change.
Which correct action should the business analyst take?
- A. Confront the stakeholder that requested the change.
- B. Follow the change control process as defined in the business analysis plan.
- C. Ask the developer to correct the logo as stated in the requirement.
- D. Discuss the change in the next stakeholder meeting.
Answer: D
Explanation:
Explanation
NEW QUESTION 53
A new product was designed and delivered to the customer. The product exceeded customer expectations but did not meet the baseline budget for the product. What could be the issue?
- A. There is no issue since the product exceeded the customer expectations.
- B. The sponsor approved the release of the product without reviewing the budget.
- C. Requirements were not properly traced and monitored.
- D. Risks identified in the risk management plan were not addressed properly.
Answer: B
NEW QUESTION 54
A company has launched a new online sales application and engaged a focus group to test how quickly the customer could place an order. The focus group also provided feedback on their satisfaction.
Which metrics tool should the business analyst use to record the results?
- A. Business completion
- B. Sales and marketing
- C. Focus group
- D. Customer
Answer: D
NEW QUESTION 55
Which of the following best describes the function of the requirements baseline?
- A. Tracks the progress of requirements documentation.
- B. Provides the basis for the development scope.
- C. Defines how the project will be scheduled.
- D. Controls the product development and evolution.
Answer: A
Explanation:
Explanation
Explanation/Reference: https://www.jamasoftware.com/blog/defining-requirement-baseline/
NEW QUESTION 56
Which function involves auditing both the quality requirements to resolve discrepancies and the results of quality control measurements to ensure that appropriate quality standards and operational definitions are being used?
- A. Quality management
- B. Quality assessment
- C. Quality control
- D. Quality assurance
Answer: D
NEW QUESTION 57
A sponsor requests a new requirement The business analyst explains that most of the information needed for this requirement does not exist and that the requirement cannot be implemented. The business analyst recommends deferring the requirement until the needed information is available and then adding it to a subsequent project The sponsor agrees.
What should the business analyst do next?
- A. Communicate that the status of this requirement has changed.
- B. Mark the requirement as complete so that it is not forgotten.
- C. Bring the subsequent project to the change control board (CCB).
- D. Ask the stakeholders to review the requirement before any other action is taken.
Answer: D
NEW QUESTION 58
Company A has been awarded a contract to finalize the development of a product that Company B was not able to finish. The business analyst is given a copy of the documentation left by Company B.
To which of the following documents should the business analyst pay the most attention to ensure the project succeeds this time?
- A. Application design documentation
- B. Clauses in the contract
- C. Business use cases
- D. Test case documentation
Answer: C
NEW QUESTION 59
A company is awarded a contract to design and build a custom product. The contract references a detailed technical specification. What is the best action to take to ensure the design meets customer requirements?
- A. Generate a design package for the product and ask the customer to verify that the design meets his or her technical needs.
- B. Develop a test plan to verify that the product meets the performance requirements in the technical specification.
- C. Create a system requirements verification matrix to trace the design to the technical requirements and include verification methods.
- D. Conduct a one-on-one interview with each member of the technical team to ensure that they understand the customers specification.
Answer: B
NEW QUESTION 60
A company has developed a new product for a customer. The customer provided a specification, but the company did not produce the system requirements in the verification matrix.
The customer is having difficulty determining if the product is meeting the requirements during the test event because the:
- A. requirements in the technical specification are unclear and ambiguous.
- B. test engineer is not communicating effectively with the customer.
- C. customer did not adequately review the test procedure before the test.
- D. customer cannot make this determination until the entire test is complete.
Answer: A
NEW QUESTION 61
......