
Pass SAP Application Associate C_TPLM30_67 exam [Nov 04, 2021] Updated 97 Questions
SAP C_TPLM30_67 Actual Questions and 100% Cover Real Exam Questions
NEW QUESTION 44
What are the 3 types of Order?
There are 3 correct answers to this question.
Response:
- A. Maintenance order
- B. Category
- C. Refurbishment
- D. Preventive maintenance order
- E. Lists
Answer: A,C,D
NEW QUESTION 45
What is the info cube dimensions?
Please choose the correct answer.
Response:
- A. Controller
- B. Message reader
- C. Functional location/equipment
- D. Maintenance
- E. Project analysis
Answer: C
NEW QUESTION 46
What are the prerequisites for the calculation of planned costs in an order? (Choose three)
- A. The costing indicator must be set in Customizing for order types.
- B. The user must save the order or execute the Determine costs function.
- C. A costing variant for planned costs must be assigned to the order type in Customizing for order types.
- D. The cost elements must be assigned to the order type in Customizing.
- E. The order operations must have a control key with the Costing indicator set in Customizing.
Answer: B,C,E
NEW QUESTION 47
A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?
- A. REL (Released)
- B. NOCO (Notification Completed)
- C. TECO (Technically Completed)
- D. ATCO (All Tasks Completed)
Answer: B
NEW QUESTION 48
You have selected Confirmation Required in the control key for operations in a maintenance order.
One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? (Choose three)
- A. CLSD
- B. CRTD
- C. PCNF
- D. CNF
- E. TECO
Answer: A,C,E
NEW QUESTION 49
Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)
- A. Create the measuring point as a counter.
- B. Specify the annual estimated usage for the measuring point.
- C. Define a valuation code group.
- D. Activate the Measurement Reading Transfer indicator.
Answer: A,B
NEW QUESTION 50
Users need to be able to select operations and work centers from the task list when they create a maintenance order with task list selection.
In Customizing, how can you accomplish this requirement? (Choose two)
- A. By setting the indicators for the planning plant only
- B. By activating the work center selection indicator
- C. By setting the indicators for the order type only
- D. By activating the operation selection indicator
Answer: B,D
NEW QUESTION 51
What does the cycle set sequence in a multiple-counter maintenance plan determine?
Please choose the correct answer.
Response:
- A. The operation sequence of a task list
- B. The scheduling sequence of a maintenance item
- C. The operation sequence of a maintenance order
- D. The scheduling sequence for a group of maintenance plans
Answer: B
NEW QUESTION 52
Your customer has several plants. How do you set up the maintenance organizational structure to implement centralized maintenance planning?
Please choose the correct answer.
Response:
- A. Assign all your work centers to one of your central planning plants.
- B. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
- C. Assign all your work centers to one of your maintenance plants.
- D. Define a plant and assign it to a company code.
Answer: B
NEW QUESTION 53
Users need to be able to select operations and work centers from the task list when they create a maintenance order with task list selection.
In Customizing, how can you accomplish this requirement? (Choose two)
- A. By setting the indicators for the planning plant only
- B. By activating the work center selection indicator
- C. By setting the indicators for the order type only
- D. By activating the operation selection indicator
Answer: B,D
NEW QUESTION 54
What does the cycle set sequence in a multiple-counter maintenance plan determine?
- A. The operation sequence of a task list
- B. The scheduling sequence of a maintenance item
- C. The operation sequence of a maintenance order
- D. The scheduling sequence for a group of maintenance plans
Answer: B
NEW QUESTION 55
When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically.
In addition to setting the reference object view in the order or the notification, what other settings must you make?
There are 2 correct answers to this question.
Response:
- A. Set the Single Installation indicator in the Functional Location master data record.
- B. Set View Profiles for Technical Objects in Customizing.
- C. Set the Equipment-Installation Allowed indicator in the Functional Location master data record.
- D. Set the Single Installation indicator in the equipment master data record.
Answer: A,C
NEW QUESTION 56
How does SAP make new functions of the SAP ERP application available to customers?
Please choose the correct answer.
Response:
- A. Via enhancement packages
- B. Via best practices
- C. Via Support Packages
- D. Via add-ons
Answer: A
NEW QUESTION 57
When a user creates a task list using the Copy function, all the header fields transfer to the new task list, with one exception.
Which field is the exception?
- A. Work Center
- B. Assembly
- C. Usage
- D. Status
Answer: D
NEW QUESTION 58
The following entries are possible in the command field (Choose five.):
- A. /nex
- B. /nsm04
- C. /nend
- D. From SAP Easy Access: search_sap_menu
- E. From SAP Easy Access: SM04
- F. ?SM04
Answer: A,B,C,D,E
NEW QUESTION 59
A maintenance work order has external processing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order.
With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition?
- A. Work center
- B. Maintenance plant
- C. Storage location
- D. Planning plant
Answer: D
NEW QUESTION 60
Which of the following rules applies to user status in orders and notifications?
- A. Changes to the user status can affect authorizations.
- B. When you set a new user status with a status number, the previous user status with status number is deactivated.
- C. When a user status is flagged as an initial status, it overrides the initial system status CRTD.
- D. The user status in the notification can be copied into the order.
Answer: B
NEW QUESTION 61
Which of the following are prerequisites for business completion? (Choose two)
- A. The order must be fully settled.
- B. The order must have planned costs.
- C. The order must have actual costs.
- D. The balance of the order must be zero.
Answer: A,D
NEW QUESTION 62
What is the purpose of the usage list for equipment history? (Choose two)
- A. To display changes to history-related fields in an equipment master record
- B. To track where the equipment was installed
- C. To document the number of breakdowns for an object
- D. To display the list of previous equipment operators
Answer: A,B
NEW QUESTION 63
What do you use to set up a refurbishment order for external refurbishment?
Please choose the correct answer.
Response:
- A. An order type for external refurbishment and an assignment of a material with split valuation.
- B. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
- C. An external operation that contains a control key for refurbishment.
- D. An order type for external refurbishment and a material item with item category External
Refurbishment.
Answer: B
NEW QUESTION 64
Find out the elements responsible for performance management.
There are 3 correct answers to this question.
Response:
- A. Execution
- B. Dispatch
- C. Ordering
- D. Project definition
- E. Investment planning
Answer: A,D,E
NEW QUESTION 65
Which of the following are prerequisites for business completion? (Choose two)
- A. The order must be fully settled.
- B. The order must have planned costs.
- C. The order must have actual costs.
- D. The balance of the order must be zero.
Answer: A,D
NEW QUESTION 66
Which command is used to set the eth0 IP address on an SC4020 controller?
- A. ifconfig inet eth0 [IP address] [netmask] [gateway]
- B. ifconfig inet eth0 [IP address/prefix length]
- C. controller ipconfig eth0 [IP address] [netmask] [gateway]
- D. controller ipconfig eth0 [IP address/prefix length]
Answer: B
Explanation:
Explanation/Reference: https://www.dell.com/community/Compellent/Dell-SC4020/td-p/5036791
NEW QUESTION 67
......
SAP C_TPLM30_67 Exam Description:
The "SAP Certified Application Associate - SAP Maintenance & Repair with ERP 6.0 EHP7" certification exam verifies that the candidate possesses basic knowledge in the area of SAP Plant Maintenance. This certificate proves that the candidate has the required understanding within this consultant profile of the ERP solution, and can implement this knowledge practically in projects under guidance of an experienced consultant. It is recommended as an entry-level qualification to allow consultants to get acquainted with the fundamentals of SAP Maintenance & Repair.
SAP C_TPLM30_67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
SAP C_TPLM30_67 Real 2021 Braindumps Mock Exam Dumps: https://www.prep4sures.top/C_TPLM30_67-exam-dumps-torrent.html